Saturday 20 October 2012

Roof on, now they can work 24/7 :)

Had a family trip down the coast on Saturday morning so after all the fun we decided to make the trip home via the house to check out the roof tile progress and it looks 100% done. (excluding the tiles missing where the scaffolding is mounted)

There seem to be no spare tiles to patch those holes, looks like they just tossed all the ones of the roof they did not need into the rubbish pile. Heaps of smashed tiles everywhere there, I was hoping for some spares in case some break down the track.

Here are some pics

Front Shot

Left side

Right side


No comments:

Post a Comment